Valve Stations Abadan-Basra Gas Transmission Pipeline
Erection and Installation of 4 Valves including, Civil & Building, Mechanical, Instrument and execution of branches for 48” transmission pipeline project (Abadan – Basra) with ASME B36,BE,LSAW,API 5L GR,X65,PSL2,THK. 1.125” specifications
LBV1 & LBV2 Stations has two branches of 36” pipeline for gas supplying to two power plants in the area & the LBV4 station is the final station of mentioned pipeline which has a Receiver and all related activities had been completely executed.