Transmission Pipeline Project (Abadan – Basra)

Erection and Installation of  4  Valves including, Civil & Building, Mechanical, Instrument and  execution of branches    for 48” transmission pipeline project (Abadan – Basra) with  ASME B36,BE,LSAW,API 5L GR,X65,PSL2,THK. 1.125” specification

LBV1 & LBV2 Stations has two branches of 36” pipeline for gas supplying to two power plants in the area & the LBV4 station is the final station of mentioned pipeline which has a Receiver and all related activities had been completely executed.

Location: Around of Basra city – Iraq

Client: TADBIR ENERGY GOSTAR IRANIAN CO.

Duration: 4 months