Mobilization and Site Preparation of Power Plant Land

  • Preparation of the site area and excavation of over 800,000 cubic – meters plus carrying out extra soil.
  • EPC contactor administration building with area of 576 M² followed with supply and execution of water, electricity and air conditioning installation
  • Triple function building (guard house, clinic and HSE) with area of 250 M² followed with supply and execution of water, electricity and air conditioning installations.
  • Client building with area of 720 M² followed with supply and execution of water, electricity and air conditioning installation
  • Indoor warehouse with area of 400 M² and related auxiliaries followed with supply and execution of water, electricity and air conditioning installation.
  • Soil and concrete mechanical laboratory building with area of 200 M² followed with supply and execution of water, electricity and air conditioning installation.
  • Dining room with area of 320 M² followed with supply and execution of water, electricity and air conditioning installation.
  • Covered Car Parking with area of 300 M² followed with landscaping plus supply and execution of lighting.
  • Temporary wash closet (WC) with area of 70 M² followed with supply and execution of water, electricity and fan installation.
  • Execution and land preparation for outdoor warehouse with area 12000 M².
  • Preparing temporary bridge over a river and access road for transporting of 460 tons Gas Turbine and 250 tons Generator from Nowshahr harbor to the site with distance of 5 Kilometers including execution of placing pipe, rock and executing of the road for the bridge with capacity of 2160 cu- meters .
  • Supply and execution for distribution of 20 KV electricity (more than 40 poles with height of 14 meters) and erection & commissioning of 20 KV/400V elevated transformer including 4 related electrical panels.
  • Executing lighting for the site including 40 lighting poles and 2000 meters cabling.
  • Executing lighting tower with height of 22 meters with eight 1000 watt projectors.
  • Supply and execution of closed circuit camera for site and mobilization area.
  • Execute pump and panel for well including related room plus erection of elevated tank.