Manufacturing, Transportation and Installation of Steel Structures

Manufacturing, Transportation and Erection of Steel Structures with total weight of 1056 tones including following activities: 

  • Manufacturing, Transportation and Erection of Water Treatment Plant Steel Structure with total weight of 200 tones. / 400V AC.
  • Manufacturing, Transportation and Erection of Turbine Hall Platform Steel Structure with total weight of 71.5 tones
  • Manufacturing, Transportation and Erection of Turbine Hall Pipe Rack Steel Structure with total weight of 127.5 tones
  • Manufacturing, Transportation and Erection of HRSG Pipe Rack Steel Structure with total weight of 140 tones
  • Manufacturing, Transportation and Erection of B.O.P (part A,B,C) Pipe Rack Steel Structure with total weight of 230 tones
  • Manufacturing, Transportation and Erection of B.O.P (part N) Pipe Rack Steel Structure with total weight of 215 tones
  • Manufacturing, Transportation and Erection of Shelter of GPRS Steel Structure with total weight of 72 tones