Main Concrete Structures of the Power Plant contract No. 2

  • Foundation of elevated water tank with more than 60 cu-meters concreting.
  • Foundation of deminerlized water tank with more than 60 cu-meters concreting.
  • Foundation of condensate receiver tank with more than 30 cu-meters concreting.
  • Supply and erection of 250 metal fences for boundary wall.
  • In and outside of power plant access roads including blockage, sub base, base, Topeka bindery and final asphalt.